Complementary apron and service buildings for the new terminal
Core Metal L.L.C • Contracts Department

Scope of Work / For the New Acquisition of Kuwait International Airport Expansion Project Packages

Package 1

Main works Maintenance of entrance, Airway walkways and connecting roads landscaping.

Package 2

Multi-story car park buildings (structural and architectural works, fire strategy compliance).

Package 3

Two service buildings for utilities, security and operations support.

Package 4

Specialized building systems — complex Mechanical, Electrical & Plumbing (MEP) and BMS integration.

Package 5

Photovoltaic systems design — PV feasibility, inverters, mounting systems and grid interconnection.

The project, for which a contract was signed with the Kuwaiti Ministry of Public Works in 2024, encompasses a catering building with approximately 69,000 square meters of floor space, a logistics consolidation center covering 26,200 square meters, security gates and guardhouse buildings, a central facility of roughly 4,700 square meters, an electrical substation, a 1.78 kilometer tunnel, 959,337 square meters of apron paving, 644,744 square meters of taxiways and service roads, a 30-kilometer stormwater drainage line, and 55 passenger boarding bridges.

As of the end of 2025, the project reached 19.5% physical completion, with procurement and subcontractor bidding processes substantially completed. Currently, within this two-year project, reinforced concrete and steel works are underway for the catering building, consolidation building, central plant, substation, east and west reservoirs, and the APM (AT1)-GSE West-GSE East tunnels. Concurrently, work continues on apron excavation, infrastructure, and concrete paving, along with the construction of on-site roads and employee parking areas.

The Kuwait International Airport Apron, Taxiways, and Service Buildings Construction is scheduled for completion by the end of 2026.

Kuwait International Airport Apron, Taxiways and Service Buildings